: Verify voltage at the sensor. Expected values are roughly 3.125V (0°) and 2.5V (45°) . 3. Pressure Transducer Maintenance

: Lower the boom completely to remove rest pressure. Disconnect hydraulic hoses. n_031.mp4

: If replacing the system chip, ensure the notch faces the correct direction to avoid frying the board. : Verify voltage at the sensor

The filename n_031.mp4 frequently appears in technical contexts related to crane systems, specifically associated with documentation for the DS 350 and EI 65 series Load Moment Indicators (LMI). Pressure Transducer Maintenance : Lower the boom completely

: Measure the signal between Pin 2 (signal) and Pin 1 (ground). Use a voltmeter at test point MP4 on the main board. 2. Angle Sensor Adjustment

: Connect a voltmeter to the main board (Black to MP15 , Red to MP4/MP5 ). Adjust potentiometers P4 or P5 to reach exactly 0.500V (500mV) .

: Test that the system successfully disables crane functions during an overload condition.