Assign a strict 25-minute "sprint" to each sub-item. If it isn't done, move to a simplified version of that item.
Define exactly what "finished" looks like for each component to prevent over-engineering. 4. Risk Mitigation (The "Pre-Mortem")
If you run out of energy/focus, what is the absolute bare minimum that can be handed over? 5. Sign-Off Checklist All "Red" tier tasks are 100% functional. One "sanity check" or peer review has been completed.
The project fails or is unusable without this. (Must do now).
Polishing, aesthetic tweaks, or "nice-to-haves." (Deferred to v0.2). 3. Tactical Execution Protocol
Identify the most likely reason this task will fail in the next 24 hours:
To prevent "The Last 10% Trap" (where the final 10% of a project takes 50% of the time), use these protocols:
Assign a strict 25-minute "sprint" to each sub-item. If it isn't done, move to a simplified version of that item.
Define exactly what "finished" looks like for each component to prevent over-engineering. 4. Risk Mitigation (The "Pre-Mortem")
If you run out of energy/focus, what is the absolute bare minimum that can be handed over? 5. Sign-Off Checklist All "Red" tier tasks are 100% functional. One "sanity check" or peer review has been completed.
The project fails or is unusable without this. (Must do now).
Polishing, aesthetic tweaks, or "nice-to-haves." (Deferred to v0.2). 3. Tactical Execution Protocol
Identify the most likely reason this task will fail in the next 24 hours:
To prevent "The Last 10% Trap" (where the final 10% of a project takes 50% of the time), use these protocols: